EXCAVATION OBJECTIVE
Gain access to south wall to remedy leaks in concrete wall.

METHOD
Open an area on South West corner to allow 7m passage along wall, with width approx 1m at base or to allow wheelbarrow etc.

Soil to be removed to bins on drive